Ta3mir or Primavera P6?
Primavera P6 is a well-known planning and scheduling tool for large portfolios. Ta3mir is not only a scheduler: it is the contractor's whole project in Arabic, where the schedule is linked to the BOQ, certificates, cost and the site. You can keep P6 for planning and import its schedule into Ta3mir.
Where Primavera P6 is strong
Fairness first: these strengths are documented on its official pages.
- Oracle presents it as a solution for planning, scheduling and managing projects, programs and portfolios.
- Calculates earned value, including SPI and CPI.
- Available on-premises or in the cloud, with a Windows desktop client.
- Arabic is one of its localized interface languages.
- The P6 Team Member app on iOS and Android updates task status.
What Primavera P6 does not cover, per its pages
And these are the limits of what it offers according to its official pages, with the Ta3mir module that covers each:
A schedule alone does not pay a certificate
BOQs, payment certificates, RFIs, daily logs, stores and accounting are not part of P6 itself; Oracle offers some of them in other products.
An unpublished price
Oracle does not publish its price; the cloud subscription is billed per hosted named user.
Signs Ta3mir fits you better
If two or more of these apply to you, Ta3mir may suit you better:
Pick what applies to you.
The same task in Primavera P6 and in Ta3mir
The competitor column is taken from its official pages on the date shown; the Ta3mir column lists modules that work today, each with its page.
| Task | In Primavera P6 | In Ta3mir |
|---|---|---|
| Oracle presents it as a solution for planning, scheduling and managing projects, programs and portfolios. | Gantt and a critical path recomputed on every edit, with baselines. Details | |
| Calculates earned value, including SPI and CPI. | SPI and CPI from the schedule and the project's actual costs. Details | |
| BOQs, payment certificates, RFIs, daily logs, stores and accounting are not part of P6 itself; Oracle offers some of them in other products. | Certificates from BOQ quantities, with advance, retention and the consultant's approval path. Details | |
| Imports and exports XER, P6 XML and Microsoft Project XML files. | Imports XER and P6 XML files directly, with a rollback snapshot. Details | |
| The P6 Team Member app on iOS and Android updates task status. | The Ta3mir Field app: attendance by location and face, daily logs and tasks. Details |
How to move from Primavera P6 to Ta3mir
You do not start from zero, and you can keep your current program alongside at first:
Import your schedule from P6 as XER or XML.
Upload the BOQ from Excel and link its items to activities.
Prepare the next certificate from executed quantities.
Invite the site team to the Ta3mir Field app.
If you are not ready to move yet, start with Ta3mir's free Excel templates, with no sign-up.
Frequently asked questions
Do I have to leave Primavera P6?
No. Ta3mir imports XER and P6 XML files, so the planner can stay in P6 while the rest of the team works in Ta3mir.
Does Ta3mir suit very large portfolios?
Ta3mir is built for a contractor's or engineering office's whole project. If your main need is advanced scheduling of a very large multi-project portfolio, compare your requirements carefully and talk to us.
Does Ta3mir calculate earned value?
Yes, SPI and CPI from the schedule and the actual costs recorded on the project.
Link your schedule to certificates and cost in Ta3mir